2013 To Do List…Recap (at last!)

sewhooked to do 2013 At the beginning of the last few years, I have recapped the UFO projects accumulated at the beginning of the previous year to see how much progress I made on each one. These lists do not include new projects that popped up over the year, though newbies often make an appearance on the following year’s list! When 2013 began, and I made my 2013 list, I was working full time outside of my home. After half a year of burning the candle not only at both ends, but in the middle too, I realized the life I was leading was not working for myself or for my family. When I left my full-time position, I fell right back into Sewhooked and, most importantly, back to my family.

Definitions of some initialisms used in this post:

UFO = UnFinished Object – a project that has been set aside and allowed to collect dust. Chances are it’s existence has been forgotten until it’s pulled out of whatever dark hole it was stuffed into. While there, it probably multiplied like Tribbles, leaving many more UFOs than you remember putting there in the first place.

USO = UnStarted Object – a project that has yet not made it out of it’s incubation period. Often comes in the shape of a stack of fat quarters, a jelly roll or other similarly delicious fabric apparition. Can also appear as a pattern or book with little hearts doodled on the cover. Hopes to be a…

WIP = Work In Progress  – Always in danger of becoming a UFO, a WIP is a project that is currently being worked on, and will hopefully become a…

FO = Finished Object – What all projects dream of being. The object of much blog activity and excitement and a good source of personal pride. The Ultimate Destination of a UFO and WIP.

2013 Project To Do List

Project – 2011 Five @ The Hive block of the month, designed by Sue Carter January 2013 – Need to add top & bottom border, quilt and bind.  Have border, backing and binding fabric.

2013 To Do - Done! 5 @ The Hive Quilt from 2011

Status – FO and Gifted! Discussed in this TTMT (6:40 or so). Quilted by my friend Osie and given to my in-laws last year.

2013 Project To Do List

Project – Harry Potter Alphabet Quilt, designed by me. January 2013 – To be quilted & bound. Have back/binding fabric.

Harry Potter Title Font Alphabet Quilt

Status – FO! I talk about it in this TTMT. Quilted by Osie. She practiced pebbles on this and I LOVE the way it came out! I’m keeping this beauty for myself. I started designing and piecing the blocks in 2005 or 2006 and they sat in a shoebox for years.

2013 Project To Do List

Project – Hand applique wreath. January 2013 –  Needs to be bound with green fabric (shown).

Hand Applique...finished at last!

Status – FO! Done and gifted to my best friend, Jewells! 2013 Project To Do List

Project – Harry Potter swap block quilts (1 & 2) January 2013 – Quilt 1 needs a border, back and binding. To be quilted & bound. Quilt 2 needs to be pieced, quilted & bound.

Harry Potter Swap Quilt

Status, HP Swap Quilt 1 – WIP. Border added. needs to be quilted and bound. Have batting & backing fabric. Donated to The Linus Connection April 2013

Status, HP Swap Quilt 2FO. These were blocks that didn’t quite fit the layout I worked out for the HP blocks. This one was pieced, free-motion quilted, bound and donated to The Linus Connection 2013 Project To Do List

Project – Vintage quilt top. January 2013 – To be quilted, possibly by hand. Needs a back & binding. I’m thinking muslin for the back. StatusUFO. No change. 😦

2013 Project To Do List

Project – Vintage churn dash & reproduction fabric snowball quilt top. January 2013 -Needs borders, back and to be quilted & bound.

Churn Dash Quilt

StatusWIP. Has borders, backing and batting. Needs to be quilted & bound. 2013 Project To Do List

Project – Green/Purple 10 minute block quilt. January 2013 – Needs borders and to be quilted and bound. To be saved for a baby gift.

10 Minute Block Green & Purple Quilt

StatusWIP. Borders added, have backing and batting. To be quilted/bound.

2013 Project To Do List

Project – There and Back Again signature blocks January 2013 – To be pieced into a top. Will need fabric for sashing and possible center piece. StatusUFO. No change. I’m missing a block from one of the designers, so I have put off working on this.

2013 Project To Do List

Project – Misc  2 1/2″ & 4 1/2″ half-square triangles. January 2013 – To be pieced into a quilt top. Have taupe fabric for solid blocks to include in piecing.

Donated to The Linus Connection April 2013

Status – FO. 4 1/2″ half-square triangles pieced into quilt top. Free-motion quilted and bound, donated to The Linus Connection April 2013. Blogged about here. Still have lots of 2 1/2″ half-square triangles. 2013 Project To Do List

Project – There and Back Again (TABABOM). January 2013 – Needs a back and to be quilted, bound. TABABOM top

Status WIP-ish. Have backing, batting and binding. Not yet quilted.

2013 Project To Do List 2013 Project To Do List

Project – Project of Doom Signature Quilt January 2013 – Finish the hand embroidery in the border, needs a back and to be quilted & bound. Will read “The Project of Doom 2011 Participants.”

Project of Doom Signature Quilt

StatusWIP. Embroidery finished, quilted by Shannon Shaw of Rock Creek Quilts. Needs binding.

2013 Project To Do List

Project – Embroidered block quilt top. January 2013 – Needs a border, back and to be quilted, bound. To be saved for a baby gift.

Hand embroidered flower quilt

StatusWIP. Borders added, have back & binding. To be quilted & bound.

2013 Project To Do List

Project – Topsy Turvy Trees January 2013 – Needs a back and to be quilted, bound. Status – No change.

2013 Project To Do List

Project – Orphan block collection (mine and many many collected from others) January 2013 – Make into a quilt (or several!) for The Linus Connection.

Donated to The Linus Connection April 2013 Orphan Block quilt for The Linus Connection And now it's a star again! #linusconnection

Status – FO/WIP – Finished one quilt and two quilt tops for donation to The Linus Connection and still have more orphan blocks! The second quilt needs a border, backing, quilting and binding. The third (star) quilt needs a backing, batting & binding.

2013 Project To Do List

Project – Flannel quilt top (I have NO idea when I pieced this, most of these fabrics have been gone from my stash for years!) January 2013 – Needs a back and to be quilted, bound, to be donated to The Linus Connection.

Donated to The Linus Connection April 2013

Status – FO. Quilted & bound, donated to The Linus Connection. Blogged!

2013 Project To Do List

Project – Monkey fabric from Jewells January 2013 – NEW PROJECT – Make into a quilt for The Linus Connection.

Quilt top for The Linus Connection

Status – FO. Made into a quilt top during Retreat 2013 and donated to The Linus Connection. Donated to The Linus Connection. This is only ph0to of the top I could find and it’s on the wall at the very beginning of this TTMT. I won’t lie, watching this video brought on the tears. My beloved Tackett is giving me some serious snuggles at the beginning which reminded me of why I miss him so much every day.

2013 Project To Do List

Project – Australia fabric from Cat January 2013 – NEW PROJECT – Pick a pattern and make top, hopefully king size!

Australia Fabric Project

StatusUFO. (Actually, USO…UnStarted Object!). I’ve picked a pattern I like, and that’s as far as I’ve gotten. I need to find an accent fabric and cut this puppy out!

2013 Project To Do List

Project – Fabric collection from Kristel, won from one of her TTMT drawings. January 2013  NEW PROJECT – I would like to make this into a new bag for myself! Fancy that!

Status – Not even a UFO.  I picked a bag pattern and then changed my mind. I’m considering sharing the love and passing this on as a prize.

Summary – Not bad, not bad! That’s seven completed quilts, one quilt that just needs a binding, several completed tops and a couple of projects that just need to get a little closer to done. I’m always equally surprised by A) how much I finished and B) what I forgot completely about.

Now, to work on my 2014 list!

Feel like being challenged to work on your UFOs in 2014? Pren, from The Convivial Crafter, a long time crafty friend of mine, has started a crafty support group Facebook group for just that reason! Her goal: One finished UFO per month! Totally doable, right?! Join UFO Project 2014. There are drawings and stuff!

Photobucket Craftsy | Etsy | Facebook | SHFB | Flickr | Twitter | PinterestBloglovin

Piece with me! Paper Piecing Vintage BOM, $12 on Craftsy!

5 thoughts on “2013 To Do List…Recap (at last!)

  1. quiltncards

    Wow! Lots of quilts there! And they are all lookin’ good.
    I have a question… I always have a question…
    Where can I find the pattern for the plant with teeth (in the second quilt of exchange blocks with a HP theme)? I looked through HP, of course, but I didn’t see it. (I also notice that the number of HP patterns on Sewhooked were not as complete as on FIS.) Love those HP patterns.
    Hugs

    Reply
    1. Jennifer Ofenstein Post author

      Unfortunately, there’s not a pattern for that one. It’s a block I received in a swap and she didn’t design a pattern. I think she just winged it!

      For the HP patterns, the ones on Sewhooked are only patterns designed by me, while the patterns on Fandom In Stitches are designed by myself and a number of other people. I get a lot of email from people that want “just” HP my patterns, so I set them aside here on Sewhooked. 🙂

      Reply

Talk to me!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s